What it inspects
Check-weighing every pod, a lid camera for creases and coffee on the rim, and sometimes sample leak or oxygen checks. Each is a separate station; ask which are priced.
No DramaBuyer guide · Coffee & tea
Search for a capsule inspection machine and almost every result checks pharmaceutical capsules, so the hard part is finding a unit built for coffee pods that weighs, checks the lid and rejects at your filler's speed.

01
Check-weighing every pod, a lid camera for creases and coffee on the rim, and sometimes sample leak or oxygen checks. Each is a separate station; ask which are priced.
It must take every pod the filler makes, lane by lane. Ask the rated pods per minute per lane.
It should stop the filler on repeated rejects and report the failing lane. Ask who writes that link.
A reject lamp proves nothing. Ask for a confirmed reject bin and a log of every rejected pod.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Run good pods mixed with planted faults: underweight, creased lid, coffee on the rim. | Every planted fault rejected into the bin and logged, with no good pod rejected in the run. |
| Run at your filler's full outfeed speed for an agreed period. | No pod missed or jammed, and weights repeat on pods passed twice. |
| Trip the reject confirmation on purpose. | The line stops and the fault shows on the screen. |
04
05
That is a pharmaceutical checker. For pods, ask for a checkweigher and lid vision built for your pod.
Add only a lid vision camera, rather than a second full inspection unit.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Coffee & tea page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
Whether it was built for coffee pods at all, reject reliability at speed, and who supports the filler link.
Planted faults caught, rejects confirmed and logged, speed held, load cell calibration, and the serial number on the declaration.
A Declaration of Conformity under 2006/42/EC until 19 January 2027 or Regulation (EU) 2023/1230 after, with 2014/35/EU and 2014/30/EU.
The business placing it on the EU market, which checks the documents and adds its name and address.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.