Cleanliness target and test method
Residual particles per component, as in ISO 16232 or VDA 19.1 for automotive parts, or a film residue limit. The line is designed backwards from this number, so it belongs in the enquiry.
No DramaBuyer guide · Industrial cleaning
An aqueous parts cleaning line is bought against a cleanliness specification, yet most quotations describe tanks and stages rather than the particle or residue limit your customer will measure, so a line can arrive complete and still fail your first audit.

01
Residual particles per component, as in ISO 16232 or VDA 19.1 for automotive parts, or a film residue limit. The line is designed backwards from this number, so it belongs in the enquiry.
Wash, one or more rinses, rust protection, drying. Each extra rinse cuts chemical carry-over; a quote that drops one is cheaper and dirtier.
Manual baskets, a gantry or a robot. Slow transfer lets parts dry with spots or flash rust between tanks.
Oil separator, bag or cartridge filters, and a conductivity probe on the final rinse fed with deionised water. These keep results stable for months.
Hot air suits open parts. Vacuum drying costs more and is often what blind holes and cast passages need.
Spent baths and rinse overflow must go somewhere. Ask whether wastewater treatment or an evaporator is in scope; it is easy to leave out.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Run production parts through every stage at the quoted cycle time, then extract and analyse residual particles by your customer's method. | Every sampled part is inside the limit, with the lab report attached to the acceptance record. |
| Log final rinse conductivity across a full shift. | It stays under the value agreed in the contract, showing carry-over is under control. |
| Inspect blind holes and threads after drying and after the agreed hold time. | No standing water, no drying stains, no flash rust. |
04
05
An industrial parts washer. One heated cabinet does the job without rinse and drying stages.
A tunnel washing machine, which is shorter to install and simpler to run.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Industrial cleaning page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
Process engineering against your cleanliness limit, bath care and after-sales chemistry support. Compare lab results on your parts, not tank lists.
Whether the factory has a cleanliness lab or partner lab, a line it built running your parts, and welded tank quality.
A declaration for the complete assembly, the electrical rules named, CE marking, and a manual in your language.
The business placing it on the EU market, usually the buyer. It checks the file for the whole assembly and adds its name.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.