Vibration, bounce or rotary action
A vibrating table packs loose material downward. A bounce action moves the tray vertically and is sold as packing the crutch end better. Ask for a density check near the filter.
No DramaBuyer guide · Cannabis & hemp
Most cone filling machines on the market look identical and carry the same asking price, so the real difference, how evenly one shaking cycle packs a full tray of cones, only shows up when your own material is in it.

01
A vibrating table packs loose material downward. A bounce action moves the tray vertically and is sold as packing the crutch end better. Ask for a density check near the filter.
Listings name 100-cone trays and lengths such as 70, 84, 98 and 109 mm or 78 and 110 mm. Each length needs its own tray and funnel set. Count how many sets are in the price.
Cones per hour depends on seconds per cycle plus loading empty cones and unloading full ones. A filler that shakes fast but takes minutes to load is a slow filler.
Ask whether intensity and duration are set on a dial or stored as a numbered program. A stored program lets a second operator repeat the first operator's density.
The vibration motor and tray clamps take the wear. Ask for the motor make and a spare tray price.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Film one full tray cycle with your material, then weigh ten cones from the corners and ten from the centre. | Corner and centre cones inside the same weight tolerance, with both averages recorded. |
| Cut open five filled cones along their length after the cycle. | Material packed to the filter with no void at the crutch end. |
| Time ten complete cycles including loading and unloading. | The measured cones per hour is the number written into the contract. |
04
05
A pre roll machine with per-cone dosing and a check-weigher.
A manual knock box and a scale. Buy the machine once daily volume justifies trays.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Cannabis & hemp page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
The one whose tray fills your cone size evenly in a filmed test with your material. Choose on corner-to-centre weight spread and spare trays.
The shaking principle is the same. Pay more only for stored programs, parts held in Europe or a better tested density.
A Declaration of Conformity with the serial number and a technical file behind it. Whether you may run this machine, and on what material, depends on the licence your business holds where the machine will be used.
You are, if you place it on the EU market. Your name and address go on the machine or its documents and you check the conformity documentation.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.