Flame and gas supply
Sealing uses oxygen with LPG, natural gas or hydrogen, which puts gas storage and permits on your site. Ask which gas the burners are set for.
No DramaBuyer guide · Pharma & supplements
An ampoule filling machine closes glass with a gas flame, so the hard part is the seal: a tip that is too thin, burnt or carrying a drop of product fails the leak test, and a speed demo on empty ampoules never shows it.

01
Sealing uses oxygen with LPG, natural gas or hydrogen, which puts gas storage and permits on your site. Ask which gas the burners are set for.
Oxygen-sensitive products need nitrogen before and after filling. Several listings offer it as an option, so check it is priced in.
Output falls as the ampoule grows. Ask for the rated speed at your size, not at 1 to 2 ml.
Glass, metal, ceramic or peristaltic pumps, on 1 to 20 heads. The accuracy claim belongs to one pump type.
Washer, sterilising tunnel and leak tester are separate items. A filler alone assumes sterile ampoules arrive.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Fill and seal a counted run of your ampoules with a liquid close to your product. | Each ampoule weighed in tolerance; every tip closed round with no char or thin spot. |
| Leak test the sealed run by dye or vacuum. | Zero leakers in the run, or the rate you set before the test. |
04
05
A vial filling machine, which closes with a stopper and cap and no flame.
An oral liquid filling machine with screw or roll-on caps.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Pharma & supplements page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
Leak test results on your ampoules at your size, the gas train drawings and the IQ/OQ package.
A Declaration of Conformity under 2006/42/EC, or Regulation (EU) 2023/1230 from 20 January 2027. Medicines from a licensed manufacturer fall under EU GMP (EudraLex Volume 4) and Annex 1. Gas storage needs local permits.
Burner settings recorded, a leak test on a sealed run, nitrogen flow if fitted, and weighed fills.
The business placing the machine on the EU market. It checks the documents and adds its name.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.