Belt material and cover
PVC or PU for cartons and food, rubber with fabric or steel cord for bulk. Ask for the belt maker, the plies and the cover thickness on the quote, not only the word PVC.
No DramaBuyer guide · Material handling
The words belt conveyor cover a bench-top parcel conveyor and a kilometre of mine conveyor, so two quotes only compare once you have fixed the belt material, the load per metre, the incline and the hours it runs.

01
PVC or PU for cartons and food, rubber with fabric or steel cord for bulk. Ask for the belt maker, the plies and the cover thickness on the quote, not only the word PVC.
A belt sized for light cartons on the flat can slip or stall on an incline with heavier product. Ask for the drive calculation at your worst case.
Brand, power and whether the motor is rated for continuous duty at your voltage and frequency. Low-price units often use a small geared motor sized for demonstration speed.
Crowned pulleys, adjustable ends and a take-up that keeps tension over time. Poor tracking is the most common complaint after the first month.
Aluminium profile or painted or stainless steel. Check leg spacing, height adjustment and whether side guides are included.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Run the conveyor loaded with your heaviest product at the quoted speed for a full shift. | No belt slip, motor temperature stable, and the belt stays inside its tracking marks. |
| Stop and start under full load ten times. | It restarts each time without stalling and without product falling at the transfer. |
| Press every emergency stop and pull-cord along the length. | The belt stops from every point and needs a manual reset to restart. |
04
05
A pallet conveyor or roller conveyor system, which carries heavy units without belt wear.
A screw conveyor or bucket elevator, which contain dust and climb steeply.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Material handling page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
Often, for simple sections. The gap closes once you specify a named belt, a rated motor and stainless parts. Compare equal specifications.
Belt data against the quote, motor nameplate, tracking under load, guards at pulleys and nip points, emergency stops, and frame welds.
EN 620 covers fixed belt conveyors for bulk material, and EN 619 covers unit load handling. Ask which one the supplier designed to.
The company that places it on the EU market, often the buyer. That company checks the declaration and adds its name and address.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.