Ice capacity per m²
Divide condenser capacity by shelf area. One maker gives 12 L per m², another about 15 kg. A low ratio forces thinner loading.
No DramaBuyer guide · Food & candy
At plant size the chamber is the easy part; the cycle is decided by ice capacity against shelf area, and by the blast freezer and cooling tower the quote may leave out.

01
Divide condenser capacity by shelf area. One maker gives 12 L per m², another about 15 kg. A low ratio forces thinner loading.
Two spec sheets state -40 °C and -75 °C. Colder traps suit sugary products and cost compressor power.
Trolley plants expect product frozen outside. No blast freezer in the quote means a missing machine.
Water-cooled condensing needs a tower or chiller. A 20 m² sheet states 93 kW installed, a 50 m² sheet 57 kW: ask what each counts.
02
In one series the code gives ice litres and shelf m². Other makers' numbers are arbitrary.
03
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
04
| Require this | A pass looks like |
|---|---|
| A full load at quoted shelf area, one complete cycle. | Cycle time within contract; end moisture on trays from every trolley at target. |
| Weigh the condenser ice after the cycle. | Water removed matches product water content, trap below its rated limit. |
| Empty-chamber pull-down. | Condenser temperature and vacuum reached within contract times. |
05
06
A commercial freeze dryer, far simpler to install.
A spray dryer: liquid to powder in seconds, not a day.
07
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
08
Every machine we source in this area is on the Food & candy page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
Compressors, pumps, controls and local service differ more than chamber steel.
Own refrigeration and vacuum build, logs from plants this size, and a test chamber for your product.
Machinery, low voltage, EMC, pressure equipment where relevant, and food contact, each with its file.
As a plant project: utilities, foundations and rigging first.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.