Scope
Mix preparation (blending, pasteurising, homogenising, ageing), continuous freezer, forming, hardening. Listings often price one piece and call it a line.
No DramaBuyer guide · Food & candy
An ice cream line is quoted in litres per hour without saying litres of what, mix going in or aerated ice cream coming out, and with overrun the two can differ by half.

01
Mix preparation (blending, pasteurising, homogenising, ageing), continuous freezer, forming, hardening. Listings often price one piece and call it a line.
Capacity, overrun range, dasher and barrel design. Ask at what overrun and draw temperature capacity was measured.
Cup and cone filling, stick moulding, or extrusion onto a tray. Each is a different machine.
Tunnel or blast freezer, often outside the quote, and the step that fixes texture.
Ammonia, CO2 or a fluorinated gas. The F-gas Regulation (EU) 2024/573 limits which gases a new system can use and who may service it.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Run your mix through the freezer at stated capacity. | Overrun and draw temperature inside the offer, overrun checked by weighing a known volume. |
| Forming run, a counted series. | Piece weight spread inside tolerance and broken sticks or cones below the agreed count. |
| Mix pasteuriser run with its recorder. | Logged temperature at setpoint for the whole hold, with under-heated mix diverted. |
04
05
A soft serve machine.
A batch freezer and a blast freezer.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Food & candy page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
Continuous freezers carry the know-how. A used European freezer with a service record may beat a new one without local support.
Freezer running on real mix, overrun measured, hardening shown, refrigerant named, and pasteuriser records.
2006/42/EC, or Regulation (EU) 2023/1230 from 20 January 2027. Pressure parts of the refrigeration circuit may fall under 2014/68/EU. Contact parts fall under Regulation (EC) 1935/2004.
The EU business placing the line on the market, which carries its name and checks the file.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.