Scope
Where the line starts and ends. Ask for a layout drawing with every machine priced on its own row.
No DramaBuyer guide · Food & candy
A bottling line quote is a list of machines, and the total moves with the list: a rinse, fill and cap block alone, or also water treatment, bottle blowing, labelling and packing. Two totals usually price two different lines.

01
Where the line starts and ends. Ask for a layout drawing with every machine priced on its own row.
Gravity for still water, hot fill for juice, isobaric for carbonated drinks. Ask which valve is fitted and what it was built for.
Output is quoted at one bottle size, usually a small one. Ask for bottles per hour at your largest and smallest format.
Whether cleaning in place is a station with its own tanks or a hose connection.
Neck guides, star wheels and capping chucks per bottle. Ask how many formats are in the price.
02
Send these with the enquiry. Without them, any number a factory gives you is a guess dressed as a quotation.
03
| Require this | A pass looks like |
|---|---|
| Run your own bottles and caps for a counted series at rated speed. | Fill level inside tolerance on every sampled bottle, no fallen bottles or crooked caps. |
| Change over from largest to smallest bottle, timed. | Done inside the time in the offer, using only parts packed with the machine. |
| Check removal torque on caps from the run. | Every sampled cap inside your cap supplier's range. |
04
05
A semi-automatic filler and capper, or a contract bottler.
A carbonated drink filling machine with isobaric valves.
06
We name the kind of source, how many and when, and never the factory. Listed prices are asking prices, not landed cost. Where we do not hold a fact we say so: that is a GAP, not an estimate.
07
Every machine we source in this area is on the Food & candy page. How a project runs, stage by stage, is on how it works, and what it costs is on pricing.
Straight answers
A used European block with a service record can beat a new one nobody near you can repair.
Your bottles running, polish on product pipework, controller make, layout against drawing, change parts against the packing list.
Each machine needs a Declaration of Conformity under 2006/42/EC, or Regulation (EU) 2023/1230 from 20 January 2027. A joined line needs one as an assembly. Ask about hygienic design to EN 1672-2.
The EU business placing the line on the market. It adds its name and checks the conformity file.
Contact
Send a machine, a quotation you want checked, or a question. We reply with what we would look at first.
Sent
A person reads every message. You will hear back within one working day.
Not sent
Please email info@nodramachina.com directly and we will pick it up from there.